_Follow along with this video:_ --- ### evm.codes Playground evm.codes provides us a brilliant [**playground**](https://www.evm.codes/playground) to test some this out and perform a sanity check on our math! We'll consider again our original value `0x0102`. If we `shr` by 4 we expect a hex output of `0x10`, which is `16` in decimal notation. > **Note:** We're able to convert our returned hex value into its decimal form with the command `cast --to-base 0x10 dec` Let's see how this works in the evm.codes playground! Recall what's required on our stack for our `shr` opcode to function. `shr` takes `number of bits to shift` and the `32 bytes to shift`. These items need to be in our stack, in this order (top down). Our order of operations in the playground should look like this:  By clicking `Run` in the playground we can then step through each opcode and see how it affects our **memory**, **stack**, **storage** and **return values**. Stepping through our first operation, we can see that 102 is added to our stack.  The second operation adds 4 to the top of our stack.  And our final step leaves us with `10` on our stack.  This is a hex value which we know we can convert using `cast --to-base 0x10 dec`. We indeed get 16! ### A Note On calldataload It's important to note that `calldataload` will only place **32 bytes** on the stack. This means, in our previous `calldata` example, **_the last 8 digits of our calldata will not be included_** ``` 0xe026c0170000000000000000000000000000000000000000000000000000000000000001 Becomes 0xe026c01700000000000000000000000000000000000000000000000000000000 ``` Would that we needed to access the data further in the `calldata` string, that's when we would utilize an offset greater than 0!
Follow along with this video:
evm.codes provides us a brilliant playground to test some this out and perform a sanity check on our math!
We'll consider again our original value 0x0102. If we shr by 4 we expect a hex output of 0x10, which is 16 in decimal notation.
Note: We're able to convert our returned hex value into its decimal form with the command
cast --to-base 0x10 dec
Let's see how this works in the evm.codes playground!
Recall what's required on our stack for our shr opcode to function. shr takes number of bits to shift and the 32 bytes to shift. These items need to be in our stack, in this order (top down). Our order of operations in the playground should look like this:

By clicking Run in the playground we can then step through each opcode and see how it affects our memory, stack, storage and return values.
Stepping through our first operation, we can see that 102 is added to our stack.

The second operation adds 4 to the top of our stack.

And our final step leaves us with 10 on our stack.

This is a hex value which we know we can convert using cast --to-base 0x10 dec. We indeed get 16!
It's important to note that calldataload will only place 32 bytes on the stack. This means, in our previous calldata example, the last 8 digits of our calldata will not be included
Would that we needed to access the data further in the calldata string, that's when we would utilize an offset greater than 0!
A practical demonstration of EVM right shift operation using a playground. The lesson covers how to implement a right shift operation in a playground using various inputs and then checks the results by casting the value to base 10 decimal.
Previous lesson
Previous
Next lesson
Next
Course Overview
About the course
Assembly
Writing smart contracts using Huff and Yul
Ethereum Virtual Machine OPCodes
Formal verification testing
Smart contract invariant testing
Halmos, Certora, Kontrol
Security researcher
$49,999 - $120,000 (avg. salary)
Smart Contract Auditor
$100,000 - $200,000 (avg. salary)
Guest lecturers:
Last updated on February 1, 2026
Duration: 30min
Duration: 4h 40min
Duration: 3h 58min
Duration: 1h 56min
Course Overview
About the course
Assembly
Writing smart contracts using Huff and Yul
Ethereum Virtual Machine OPCodes
Formal verification testing
Smart contract invariant testing
Halmos, Certora, Kontrol
Security researcher
$49,999 - $120,000 (avg. salary)
Smart Contract Auditor
$100,000 - $200,000 (avg. salary)
Guest lecturers:
Last updated on February 1, 2026